DIARY: October 18, 1996 08:23 AM Friday; Rod Welch

Meeting with Herb Cheong at COE on SDS methods.

1...Summary/Objective
2...Defining Terminology
3...SDS Line Numbers
4...Communication Manager
5...Need for Communication Metrics Arises from "Information Highway"
6...Action Items
7...Administrative Support
8...Reviewed Notes of 961015 Progress Meeting on Oakland Project


..............
Click here to comment!

CONTACTS 
0201 - Corps of Engineers, SFD            415 977 8400 fax 8483
020101 - Mr. Herb Cheong,; Project Manager =415 977 8705; Department

SUBJECTS
Corps of Engineers, SFD, Oakland Project
Orientation Comm Metrics, SDS
Project Manager, Herb Cheong

0505 -    ..
0506 - Summary/Objective
0507 -
050701 - Follow up ref SDS 10 0000, ref SDS 8 0000.
050702 -
050703 - Showed Herb SDS and explained Communication Metrics.  We considered
050704 - steps for wider implementation at COE of POIMS and Communication
050705 - Metrics using SDS.
050706 -
050707 -     [On 961020 submitted notes of the meeting to Herb, ref SDS 14 0001
050708 -
050709 -
050710 -
050711 -  ..
0508 -
0509 -
0510 - Discussion
0511 -
051101 - We used the drawing board in the small open conference area for
051102 - Project Management.  Drew a diagram with a table showing primary SDS
051103 - concepts that are presented during the demonstration, similar to the
051104 - procedure used for the training session conducted on 960925 for Tom
051105 - Keesling. ref SDS 3 8338
051106 -
051107 -        SDS
051108 -
051109 -           Schedule    =     Time          +
051110 -                                           +- integration
051111 -           Diary       =     Information   +
051112 -                               Meetings, Calls, Analysis
051113 -                               Documents, Correspondence
051114 -
051115 -           Contacts    =     People  (who, what, when, where, why)
051116 -
051117 -           Subjects    =     Objectives/Filing
051118 -
051119 -
051120 -
051121 - Defining Terminology
051122 -
051123 - Initially I noted that Welch brings three elements to the contract
051124 - with COE:
051125 -
051126 -    Software program:     Schedule Diary System (SDS)
051127 -
051128 -    Computer Technology:  Personal and Organizational Integrated
051129 -                          Management Support (POIMS), ref OF 1 0001
051130 -
051131 -    Management Science:   Communication Metrics, 950327. ref SDS 1 0001
051132 -
051133 - SDS is a POIMS software program, in the same way that Wordperfect and
051134 - MS Word are "wordprocessing" programs, Lotus 123 is a "spreadsheet"
051135 - program, and MS Project is a "CPM" program.  So "POIMS" is a spec or
051136 - standard for what a program must accomplish in order to support the
051137 - management process.
051138 -
051139 - Communication Metrics is the support that results from using the SDS
051140 - program as it is designed to be used.  It adds a "control" to human
051141 - understanding which is central to successful management, similar to
051142 - cost and schedule control.
051143 -
051144 -
051145 -
051146 - SDS Line Numbers
051147 -
051148 - We used the record of the demonstration for Tom Benero to get an
051149 - explanation of the line numbers in the SDS record format. ref SDS 4
051150 - 8850  In doing so, we used information developed over the past several
051151 - years.  This showed the SDS method of "recycling intellectual
051152 - capital," discussed in the POIMS paper at ref OF 1 4662, which Herb
051153 - had read to prepare for this meeting, from the submission on 961017.
051154 - ref SDS 12 0003
051155 -
051156 -
051157 -
051158 - Communication Manager
051159 -
051160 - After the demonstration we considered the question Herb asked on
051161 - Tuesday, on 961015, about the Welch role with COE, ref SDS 9 4907
051162 -
051163 - We looked at the Welch contract scope, ref DRP 1 line 202, including
051164 - the requirement for Communication Metrics, ref DRP 1 line 257.  I
051165 - explained my sense that one dimension of the Welch contract is to
051166 - define tasks and responsibilities in relation to COE work practices
051167 - for implementing Communication Metrics.
051168 -
051169 - In this regard, we looked at Marcus' concerns expressed yesterday, ref
051170 - SDS 11 line 143.
051171 -
051172 - As we examined these collateral sources from within the SDS program,
051173 - Herb noted that SDS is very powerful.
051174 -
051175 - We considered how the power of SDS is derived from its supple and
051176 - natural methods of organizing the complexity of life by applying
051177 - "automated integration" to the management process, per discussion with
051178 - Tom Keesling, ref SDS 3 line 145.  SDS empowers the Communication
051179 - Manager to provide an "intelligence" function by connecting up
051180 - disparate events and understandings into a comprehensible web of
051181 - useful "knowledge." ref SDS 2 line 547
051182 -
051183 -
051184 -
051185 - Need for Communication Metrics Arises from "Information Highway"
051186 -
051187 - The Welch contract with COE is looking at how well the SDS software
051188 - can support the methods of Communication Metrics when applied by an
051189 - "expert."  The need for this new role arises within COE as a
051190 - consequence of the general increase in the pace of business and the
051191 - flow of information, per discussion with Max last February, ref SDS 2
051192 - line 201.
051193 -
051194 - Herb mentioned the challenge executives face today from the constant
051195 - stream of information in meetings, calls, fax and email.  It is hard
051196 - to keep track of Action Items and remember detailed information from
051197 - different sources throughout a busy day.
051198 -
051199 -
051200 -  ..
051201 - Action Items
051202 -
051203 - We examined briefly Action Items in the draft of the record for the
051204 - 961015 Progress Meeting. ref SDS 8 0000  Each item is linked into the
051205 - details of the project record.  Herb seemed to indicate this method
051206 - could be helpful to avoid letting matters slip by due to the pace of
051207 - daily activity.
051208 -
051209 - He said that happens a lot, because people have a lot of meetings and
051210 - calls, go on vacation, get called into ad hoc assignments, etc, that
051211 - distract attention from following up.
051212 -
051213 -      [On 961020 letter to Herb recommends meetings to review action
051214 -      items. ref SDS 14 0001
051215 -
051216 -      [On 961021 follow up discussion with Max. ref SDS 15 0000
051217 -
051218 -      [On 961115 internal action item review meeting with COE, to
051219 -      prepare for meeting with contractor. ref SDS 17 0001
051220 -
051221 -      [On 961118 meeting with contractor to review pending action
051222 -      items. ref SDS 18 0001
051223 -
051224 -      [On 961126 meeting review contractor's progress on action items.
051225 -      ref SDS 19 0001
051226 -
051227 -
051228 -
051229 - Administrative Support
051230 -
051231 - Herb asked how much time I need to create the record.  I explained it
051232 - depends on how extensive the event is and how much new material
051233 - occurs.  An event that has a lot of new material takes a long time.
051234 - However, an event that lasts a long time, but has nothing
051235 - substantively new, can often be prepared fairly rapidly.  In this
051236 - regard, the SDS tool greatly expedites the writing, by offering clues
051237 - about what to write, and permitting linking to avoid having to enter
051238 - information that has already been captured.
051239 -
051240 - We considered the opportunity to increase the value of administrative
051241 - support within COE to its managers and executives/commanders, as
051242 - discussed with Max at ref SDS 2 line 344.
051243 -
051244 - One way would be to get documents received scanned into the system,
051245 - and to get documents issued into SDS via the computer file created to
051246 - generate them.
051247 -
051248 - If COE decides to continue the Welch effort to apply Communication
051249 - Metrics, an area of opportunity to fit the process into COE existing
051250 - culture, would be to train secretaries to perform some of the data
051251 - entry, beginning with documents received and issued.
051252 -
051253 -
051254 -
051255 - Reviewed Notes of 961015 Progress Meeting on Oakland Project
051256 -
051257 - We discussed Herb's comments on the explanation of Gail Staba's
051258 - remarks at the 961015 Progress Meeting about a letter to COE, ref SDS
051259 - 8 line 307, including the background of analysis at ref SDS 6 line
051260 - 134.
051261 -
051262 -     Herb advised a letter on this matter was issued by COE yesterday.
051263 -     Max signed it because Tom Keesling was out.
051264 -
051265 -     [See entering edits at ref SDS 13 line 58.]
051266 -
051267 -     [See correction on date of issue and scope of letter to EPA at ref
051268 -     SDS 16 line 449.]
051269 -
051270 -
051271 -
051272 -
Distribution. . . . See "CONTACTS"