DIARY: December 13, 1994 07:09 AM Tuesday; Rod Welch

Post Action Items to Progress meeting with CDWR.

1...Summary/Objective
2...Tito submitted Jivat's Notes
3...Power for Valves
...PG&E Can Notify CDWR of Solutions Independent of PG&E


..............
Click here to comment!

CONTACTS 
0201 - PG&E Trans Sys Engineering         415 973 3877 fax 9209
020101 - Mr. Jivat Gidvani, E.E.
020102 - Engineer; Rm 580, Mail Code F5C =415 973 3877

SUBJECTS
Central Coast Aqueduct, PG&E
Meetings: 941208 Sacramento with CDWR
Notes & Follow Up

0605 -    ..
0606 - Summary/Objective
0607 -
060701 - Followed up work at ref SDS 5 line 35.  Create SI for Action Items
060702 - from Progress meeting 941208, ref SDS 3 line 98, and tag the record
060703 - for follow up.
060704 -
060705 -
060706 -
060707 -
0608 -
0609 -
0610 - Revisions
0611 -
061101 - Decided to revise the notes to reflect the discussion on the SLO
061102 - Hydro plant delay, so all of the considerations are with her
061103 - announcement.
061104 - ..
061105 - I guess I will put it all back.  What I am wrestling with is
061106 - that this change entails work to think through the schedule and cost
061107 - issues.  The first task though is to determine CDWR's performance
061108 - objectives, relative to design.  So it seems this is still mainly a
061109 - design matter, and secondarily a Schedule matter, even though the
061110 - first thing we need to do is "schedule" the tasks to perform the work.
061111 -
061112 -
061113 -
0612 -
0613 -
061301 -
0614 -
0615 -

SUBJECTS
Transmission Line Design, PG&E
SLO Hydro Tie Line
Engineering, Material Lead Time
Transfer Trip
CDWR & PG&E plan change in SLO Hydro work

1408 - 0834
1409 -
140901 -  ..
140902 - Tito submitted Jivat's Notes
140903 -
140904 - Followed up work at ref SDS 5 line 95.
140905 -
140906 - He indicates the following which was in the notes, is untrue, in that
140907 - he can proceed with the design of the Transfer Trip system without
140908 - having the design of the Control Room.
140909 -
140910 -     Some materials have been ordered for the Transfer Trip system.
140911 -     PG&E design cannot continue until CDWR submits the design of the
140912 -     Control Room and other criteria.  This is Action Item 3,
140913 -     discussed at the Oct 5, Progress meeting at ref SDS 2 line 628.
140914 -     CDWR had indicated this information would be submitted by Dec 31,
140915 -     1994, per ref SDS 2 line 633.
140916 - ..
140917 - He does not offer an alternative statement.
140918 -
140919 - I don't understand why PG&E needs drawings from CDWR on the Control
140920 - Room by 941231, if it does not effect PG&E's engineering work.
140921 -
140922 -      I mentioned Jivat's position to Lori Brown at ref SDS 6 line 139.
140923 -
140924 -    [Discussed this with Jivat at ref SDS 7 line 58, and decided to
140925 -    change these notes.]
140926 -
140927 -
140928 -
140929 -  ..
1410 -
1411 -
1412 - 1052 called Jivat for clarification
1413 -
141301 - His voice mail says he is out today.  Left message for him to call
141302 - tomorrow.
141303 -
141304 -
141305 -  ..
141306 - Power for Valves
141307 -
141308 - Jivat proposes omitting the alternate solutions discussed at the
141309 - meeting, on addressing CDWR's decision to delay the SLO Hydro plant
141310 - work.
141311 -
141312 - He suggests replacing the following current langauge:
141313 -
141314 -       Tom Marki said PG&E will submit comments to assist CDWR in its
141315 -       design considerations.  Bill DeHart suggested contacting Glenn
141316 -       Rounds for input.
141317 -
141318 -   ...with this:
141319 -       ..
141320 -       Tom Marki said PG&E will consult operating and power
141321 -       control group to see if CDWR switchyard can be energized to
141322 -       provide auxilary power without installing transfer trip
141323 -       equipment.
141324 -
141325 -    ..
141326 -   PG&E Can Notify CDWR of Solutions Independent of PG&E
141327 -
141328 -   I would like to leave the alternate solutions because it reflects
141329 -   what was said, as indicated by others who have reviewed and
141330 -   concurred with the original language.  Additionally the listing
141331 -   shows there are a variety of solutions which do not depend on PG&E,
141332 -   i.e., the burden is with CDWR.
141333 -
141334 -   I will add to solution #5, changing it from:
141335 -
141336 -       5.  Construct the Tie Line under alternate Line Protection
141337 -           measures.
141338 -
141339 -   ...to:
141340 -           ..
141341 -       5.  Construct the Tie Line under alternate Line Protection
141342 -           standards, e.g., omit transfer trip equipment.
141343 -
141344 -   Jivat's revised language for option 5, reflects our discussion
141345 -   yesterday at ref SDS 4 line 176 that PG&E may be able to build the
141346 -   line without a transfer trip system.
141347 -
141348 -   I mentioned the possibility of avoiding the transfer trip to Lori
141349 -   Brown at ref SDS 6 line 139.
141350 -
141351 -   [Jivat feels very strongly about removing the specific options, per
141352 -   ref SDS 7 line 99, so I did that.]
141353 -
141354 -
141355 -
141356 -
141357 -
141358 -
141359 -
141360 -
Distribution. . . . See "CONTACTS"