DIARY: September 29, 1994 11:00 AM Thursday; Rod Welch

Meeting with Jivat on Action Item status, schedule, work scope.

1...Summary/Objective
2...CDWR Pending Action Items
......Comment


..............
Click here to comment!

CONTACTS 
0201 - PG&E Trans Sys Engineering         415 973 3877 fax 9209
020101 - Mr. Jivat Gidvani, E.E.
020102 - Engineer; Rm 580, Mail Code F5C =415 973 3877

SUBJECTS
Action Item status
940818 Meeting CDWR Sacramento, CDWR & PG&E
CDWR advise on space for Transfer Trip in
PG&E submit power requirements for Control
Transfer Trip
Control Room

0708 -    ..
0709 - Summary/Objective
0710 -
071001 - Followed up work at SDS 15 line 73.
071002 -
071003 - Reviewed the understandings on Action Items 13 per ref SDS 1 line 176,
071004 - and 14, per ref SDS 1 line 182.
071005 -
071006 -    This is the work discussed at ref SDS 1 line 649.
071007 -
071008 -
071009 - I also confirmed that Jivat has submitted to CDWR the information on
071010 - transfer trip design requested at ref SDS 1 line 707.
071011 -
071012 -      This was reported at ref SDS 2 line 94 re Jivat's letter ref DRP
071013 -      2 line 106.
071014 -
071015 -
071016 -
071017 - CDWR Pending Action Items
071018 -
071019 -  1.  Jivat said PG&E still needs the design of CDWR's control room,
071020 -      discussed at ref SDS 1 line 719.
071021 -
071022 -      Comment
071023 -
071024 -      This appears to be related to Action Item 4 and 5 from meeting in
071025 -      Stockton, but 4 relates to the design of the com system, and 5
071026 -      says PG&E will advise CDWR of design information, PG&E needs.
071027 -
071028 -         The latter matter suggests CDWR is waiting for PG&E to submit
071029 -         stuff, and PG&E is waiting to get CDWR's control room design.
071030 -         Need to clarify this.
071031 -
071032 -      [Followed up at ref SDS 22 line 51.]
071033 -
071034 -
071035 -  2.  Jivat did not say if CDWR has submitted to PG&E the information
071036 -      requested in Jivat's Aug 18, 1994 letter, ref DRP 2 line 48,
071037 -      cited at ref SDS 2 line 61.
071038 -
071039 -      [Followed up at ref SDS 22 line 51.]
071040 -
071041 -
0711 -
0712 -

SUBJECTS
Action Item status
940901 Meeting CDWR Stockton, Communications
PG&E submit Transfer Trip design to CDWR
PG&E submit other design information to

0907 -
090701 - Followed up work at ref SDS 20 line 133.
090702 -
090703 - Jivat wrote a memo of his understandings from the Stockton meeting
090704 - which was received at ref SDS 5 line 106.
090705 -
090706 - He indicated today that his letter to CDWR on 940902 reported in the
090707 - record at ref SDS 4 line 198, correctly interprets Jivat's EM issued
090708 - 940902, ref DIP 2 line 28, furnishes the information requested by
090709 - CDWR.
090710 -
090711 -
090712 -
090713 -
0908 -

SUBJECTS
Line Protection Equipment, Section 6.2
Transfer Trip
Control Room

1206 -   ..
120601 - Followed up work at ref SDS 19 line 110.  Jivat indicated that
120602 - the transfer trip system is typically part of "Line Protection."
120603 -
120604 - He feels it is important that this work be performed to PG&E design
120605 - and construction standards.
120606 -
120607 -
120608 -
120609 -