DIARY: September 7, 1994 11:09 AM Wednesday; Rod Welch

Update schedule on Coastal Branch II, review with Bill.

1...Summary/Objective


..............
Click here to comment!

CONTACTS 
0201 - PG&E Proj Mngmnt Transm Sys        415 973 6778 fax 8426
020101 - Mr. Bill DeHart, PMP
020102 - Senior Project Manager, Room 1183B-V11C =415 973 5655 pger 510 810 3026
020103 - Project Management Department
0202 - PG&E Building & Land Svcs.         415 223 8273 fax or 800...
020201 - Mr. Robert Masuoka; Room 2027, Mail Code H21A =415 223 8273

SUBJECTS
Coastal Branch Aquaduct, CDWR
Controls, Schedule, Interface with CDWR Activities
Pipe Manufactering
Review
Start Dates
Schedule Files
R/W Easements by CDWR

1009 -    ..
1010 - Summary/Objective
1011 -
101101 - Follow up ref SDS 13 LE4G, ref SDS 7 7F8N.
101102 -
101103 - We edited Schedule file reviewed with CDWR, 940817, and created a new
101104 - one dated 940907.
101105 -
101106 - Bill and I updated the schedule, addressing the following points:
101107 -
101108 -
101109 - Why no right of way easement tasks for Casmalia as there are for Arco
101110 - Polonio Pass (task 1.1.1) and SLO Hydro (task 2.1.2)?
101111 -
101112 -      Bill called Bob Masuoka.
101113 -
101114 -      Bob indicated we need a new task to acquire the R/W for Casmalia.
101115 -      We added the following task, and made it control Staking for
101116 -      Construction, activity 3.1.9, which is a lag to Construction,
101117 -      activity, 3,1.10:
101118 -
101119 -          3.1.1  Acquire R/W by CDWR review by PG&E
101120 -
101121 - Why no "Preliminary Pipeline Design by CDWR" activity for Arco -
101122 - Polonio Pass work, as there is on SLO Hydro, activity 2.1.1?  Seems
101123 - like this has come up in meetings, and it is possibly more important
101124 - on Arco - Polonio than on SLO Hydro portion of the work?
101125 -
101126 - Do we need tasks for transfer trip communication line; seems like
101127 - major task CDWR must complete in advance of PG&E being able to
101128 - complete its work.  Similarly for creating a control room.
101129 -
101130 -      Incorporated these new tasks:
101131 -
101132 -          2.2.1.2  Obtain Lease Lines by CDWR
101133 -
101134 -          2.2.1.4  Construct Space for Comm. Control Area by CDWR
101135 -
101136 -            Made this a milestone, since the duration is up to CDWR,
101137 -            but we need to confirm the target finish date from CDWR,
101138 -            and create a way for it to float based on actual progress
101139 -            by CDWR.
101140 -
101141 -               [This was discussed with CDWR on Sep 22, 1994 where PG&E
101142 -               was instructed to perform without regard to completion
101143 -               of CDWR work. ref SDS 16 8845
101144 -
101145 -
101146 -
101147 - Need other interfaces between CDWR schedule and PG&E Schedule, per
101148 - ref SDS 7 line 65.
101149 -
101150 -      We reviewed the schedule received from Lori Brown, ref DRT 2 line
101151 -      10, per understandings at meeting in Sacramenot on Aug 18, ref
101152 -      SDS 5 line 286.  CDWR's schedule entitled:
101153 -
101154 -                        Design & Construction  Schedule
101155 -                        dated:  940811
101156 -
101157 -      ...was received via fax from Lori on 940822.  The fax is hard to
101158 -      read, and in any case does not seem to have sufficient detail to
101159 -      determine interfaces between CDWR's work and PG&E's work.
101160 -
101161 -      Bill called Lori to schedule a meeting next week with CDWR's
101162 -      planning and scheduling engineer to obtain this information.
101163 -      She should call back tomorrow to confirm date and time.
101164 -
101165 -          [Scheduled task to follow up with Bill.]
101166 -
101167 - What is impact of pipe manufacturing delay discussed at ref SDS 3
101168 - line 75.
101169 -
101170 -      We need information from CDWR to evaluate this issue.  Somewhere
101171 -      this may feed into PG&E's construct activities.
101172 -
101173 -      [CDWR reported on pipeline construction progress at ref SDS 16
101174 -      line 156.]
101175 -
101176 -
101177 -
101178 -
101179 -
1012 -

SUBJECTS
Casmalia Interchange, Land, Cadastral Survey
Schedule, Casmalia, 115 kV TL, Survey

1205 - Summary/Objective
1206 -
120601 - Received ref DRT 1 from Bob Masuoka to Jeff Little advising about
120602 - procedures for accessing property to survey Casmalia, ref DRT 2 line
120603 - 27.
120604 -
120605 - Bob advises property owners are concerned about location of the
120606 - Casmalia pumping plant, and it appears by extension the tie line.