M E E T I N G  N O T E S

Gensler/Michael Willis/Kwan Henmi

Project Moscone Center Expansion- Phase III Project Number 01.6250.000
Meeting Location JV Team Project Office Meeting Date October 15, 1998
Subject Structural Coordination Meeting Number

72

Present

JV Team/GA
JV Team/KH
JV Team/KH
JV Team/KH
SDE
Clonia Cautis (CC)
Ivan Romero (IR)
Michael Foegelle (MF)
Janet MacKinnon (JM)
Jon Andrews (JA)
Discussion

  1. Elevators 5 and 6, Restrooms

    JM showed drawings KH has in progress to coordinate mechanical and structural at elevator 5 and 6, so that main beams do not go through HVAC shafts.

    JA reported that SDE has changed some dimensions on its structural drawings to resolve mechanical and structural coordination for the restrooms, per meeting with A&P on October 14, 1998.

    JA notes that SDE's design is not well enough established yet to provide the exact number of seismic dampers.

  2. Pre Function

    JA advised that SDE is aware that the 1st floor Pre Function area is terrazzo.

  3. Catwalk

    CC advised that the catwalk cannot interfere with HVAC.

    JM noted that KH will resolve these issues.

    CC thought this problem was solved some time ago.

  4. Elevator 5 & 6 Pit Framing

    CC advised that the elevator pit does not require a sump.





  5. Elevators 1 - 4
    Grease Duct

    MF showed a KH sketch on the grease duct at lines between 4.6, 5, and A.5, per background from meeting on Sep 29, 1998

    The grease duct separation requires structural support at all floor locations.

    CC asked if the grease duct location was changed in the 25% CD package. Michael advised there has been no change.

    During the meeting, MF prepared copies of details from KH drawings for SDE to use in updating structural drawings for core at elevators 1 - 4.

    JA and MF reviewed the KH drawings to verify dimensional requirements.

    CC noted that vents may be required at the grease shaft.

    MF reported on understandings from the meeting with A&P yesterday that no vents are required. They are, however, tied to exhaust fans.

  6. Elevator Equipment Room






  7. Sky Folding Partition at Column Line B

    MF is preparing a KH design support package for submission to SDE.

    CC asked that this information also be submitted to the electrical consultant.

  8. Basement

    There was discussion about coordinating columns at line A4 between lines 3 and 4.

    Jon indicated a preference for locating a concrete block wall outside the columns.


Action / Decisions Pending / Follow up



KH will continue present design parameters for resolving mechanical and structural issues.

SDE will modify the structural design to support JM's solution.






























SDE will modify the structural drawings to show support of the grease duct at separation.

























Jon will submit SDE drawings tomorrow for the elevator equipment room.

Clonia advised this is not on the critical path of the project schedule.


KH will submit design support package to SDE and TEE, tomorrow.






SDE has KH sketch and will incorporate.

Subframe layout will be reviewed by SDE for 50% CD set.

Gensler/Michael Willis/Kwan Henmi will rely on these notes as the approved record of matters discussed and conclusions reached during this meeting unless written notice to the contrary is received by Gensler/Michael Willis/Kwan Henmi within seven calendar days of the issue date of these meeting notes.


Distrubution

  1. JV Team/GA, Clonia Cautis
  2. JV Team/MW, Steven Hergert
  3. JV Team/KH, Bolivar Puyol
  4. JV Team/KH, Ivan Romero
  5. JV Team/KH, Michael Foegelle
  6. JV Team/KH, Janet MacKinnon
  7. SDE, Jon Andrews

Prepared by Ivan Romero Date Issued: 10/26/98