1...We need to implement a consistent attachment method. There are
2...Checkpoint meetings each week between A-E Project Manager(s) and the
CONTACTS
0201 - Corps of Engineers, SFD 415 977 8400 fax 8483
020101 - Mr. Thompson F. Keesling, Architect; Assistant Chief =415 977 8473/8701
020102 - Construction Operations Division =415 977 8480
SUBJECTS
Richmond Harbor Deepening
Staffing of Project
Construction Branch
Port of Richmond
0706 - ..
0707 - Summary/Objective
0708 -
070801 - Follow up ref SDS 13 0000.
070802 -
070803 - Completed scanning Section C scope of services and began incorporating
070804 - Communication Metrics into the specification.
070805 -
070806 -
070807 -
0709 -
0710 -
0711 - Progress
0712 -
071201 - Began draft to incorporate Communication Metrics scope into scope of
071202 - services for Quality Assurance on Richmond Harbor Project:
071203 -
071204 - SECTION C
071205 - DREDGING INSPECTION SERVICES
071206 - SCOPE OF SERVICES
071207 -
071208 - ...which is scanned into the record at ref OF 2 line 8, per
071209 - ref SDS 13 line 163.
071210 -
071211 - ..
071212 - There is a question about the meaning of the following at
071213 - ref OF 2 line 36:
071214 -
071215 - The A-E shall make appropriate use of information furnished by
071216 - this scope of services and according to the time schedule stated
071217 - herein.
071218 -
071219 -
0713 -
0714 -
0715 - 1401 called Tom
0716 -
071601 - Asked about the meaning of the above. He said it refers to the need
071602 - for A-E to make proper and timely distribution of information it must
071603 - generate under the contract. We considered clarifying this language
071604 - and Tom suggested I prepare something for this purpose.
071605 -
071606 -
071607 -
071608 - ..
0717 -
0718 -
0719 - 1433 Began Scope with Communication Metrics
0720 -
072001 - Prepared ref OF 3 line 20.
072002 -
072003 - Will change the name per discussion with Tom ref SDS 13 line 183.
072004 -
072005 -
072006 - Changed at ref OF 2 line 12:
072007 -
072008 - 2. DESCRIPTION OF WORK: The Architect-Engineer, hereinafter
072009 -
072010 - referred to as A-E, shall perform continuous inspection of new
072011 -
072012 - and O&M dredging for Richmond Harbor Deepening Project.
072013 -
072014 -
072015 - ...to, at ref OF 3 line 25:
072016 - ..
072017 - 3. DESCRIPTION OF WORK: The Architect-Engineer, hereinafter
072018 -
072019 - referred to as A-E, shall perform continuous inspection services
072020 -
072021 - ..
072022 - and Communication Metrics of new and O&M dredging for the
072023 - -------------------------
072024 - Richmond Harbor Deepening Project, hereinafter the "project" or
072025 - ----------------------------
072026 - "contract" referring to the requirements for performing
072027 - -------------------------------------------------------
072028 - construction dredging.
072029 - ----------------------
072030 -
072031 -
072032 - Added at ref OF 3 line 17.
072033 -
072034 - Communication Metrics shall ensure accurate, timely
072035 - understandings of project communications showing compliance and/
072036 - or deviations with contract plans and specifications.
072037 -
072038 - ...then changed, per ref OF 3 line 21, it to this:
072039 -
072040 - Communication Metrics shall provide alignment of project
072041 - communications with contract plans and specifications, and shall
072042 - maintain daily Action Items linked to original sources within an
072043 - electronic diary and data base of project information organized
072044 - for timely decision support.
072045 -
072046 - ...for the following reasons:
072047 -
072048 - One goal is to formulate a short statement comparable to that for
072049 - inspection of the physical work.
072050 -
072051 - "...timely understandings" is a bit nebulous and subjective
072052 - because it relates to state of mind, whereas "alignment" can be
072053 - objectively performed by linking to original sources.
072054 -
072055 - We define a "deliverable" - alignment of project communications -
072056 - which is sufficiently expansive to cover writing both SDS records
072057 - with analysis and linkages, and drafts of correspondence in order
072058 - to demonstrate alignment with contract plans and specifications.
072059 - It also entails preparing meeting agendas and briefing managers to
072060 - plan and prepare for meetings, and debriefing them after meetings
072061 - to capture an accurate record, and keep decision makers adequately
072062 - informed.
072063 -
072064 - "...daily Action Items linked to original sources" is a simple way
072065 - to describe the Schedule side of SDS that uses the record to
072066 - manage the work, without having to specify SDS nor use a term like
072067 - "automated integration" which could be considered a technique to
072068 - accomplish the objective of tasks linked into the diary.
072069 -
072070 - "...electronic diary and data base of project information" leaves
072071 - room for including all correspondence, contracts, regs and so on,
072072 - without having to include things like autocad files and other
072073 - graphics stuff.
072074 -
072075 - "...organized for timely decision support" covers the SDS record
072076 - structure, the Subject Index and automated tools to provide
072077 - portions of the record relevant to particular subjects quickly for
072078 - use in daily decision support, i.e., managing the job.
072079 -
072080 -
072081 - Changed at ref OF 2 line 20:
072082 -
072083 - During initial staging of the inspection procedures, the A-E
072084 - --------------
072085 - shall meet with the Contracting Officer's Authorized
072086 -
072087 - Representative at either the project site, Construction Service
072088 -
072089 - Branch in Sausalito, California, or in the San Francisco District
072090 -
072091 - office at 333 Market Street, San Francisco, California, to insure
072092 - ------
072093 - complete understanding of operating conditions, type of data
072094 -
072095 - ..
072096 - collected, reports, inspections to perform and analysis of
072097 - ---------------
072098 - inspection procedures and safety requirements.
072099 - ----------------------------------------------
072100 -
072101 - ...to, at ref OF 3 line 25:
072102 -
072103 - During initial staging of Quality Assurance procedures, the
072104 - -----------------
072105 - A-E shall meet with the Contracting Officer's Authorized
072106 -
072107 - Representative at either the project site, Construction Service
072108 -
072109 - Branch in Sausalito, California, or in the San Francisco District
072110 -
072111 - office at 333 Market Street, San Francisco, California, to ensure
072112 - ------
072113 - complete understanding of operating conditions, type of data
072114 -
072115 - ..
072116 - collected, reports, inspections to perform, procedures to follow
072117 - --------------------
072118 - and safety requirements.
072119 - ------------------------
072120 -
072121 -
072122 - Changed at ref OF 2 line 29:
072123 -
072124 - The A-E shall furnish all necessary personnel, facilities,
072125 -
072126 - ..
072127 - equipment including safety equipment (PFD, shoes, hard hats,
072128 - --------------------
072129 - etc), materials, radios, drafting, typing, copying and
072130 - ---------
072131 - reproduction, stenographic services and transportation (except
072132 -
072133 - crew boat transportation between the dock and the dredge) to
072134 -
072135 - perform all quality assurance work as prescribed herein.
072136 -
072137 -
072138 - ...to, at ref OF 3 line 35:
072139 -
072140 - The A-E shall furnish all necessary personnel, facilities,
072141 -
072142 - and <0250
072143 - and equipment, including safety equipment (PFD, shoes, hard hats,
072144 - --------------------
072145 - etc), radios, drafting, computers, scanning, copying and
072146 - -------------------
072147 - reproduction, plus materials, stenographic services and
072148 - --------------
072149 - transportation (except crew boat transportation between the dock
072150 -
072151 - and the dredge) to perform all quality assurance work as
072152 -
072153 - prescribed herein.
072154 -
072155 -
072156 -
072157 - Changed per discussion with Tom, above:
072158 -
072159 - The A-E shall make appropriate use of information furnished
072160 - by this scope of services and according to the time schedule
072161 - stated herein.
072162 -
072163 - ...to the following at ref OF 3 line 42.
072164 -
072165 - The A-E shall prepare and make timely distribution of
072166 - information according to the schedules stated herein, and shall
072167 - maintain such information in an appropriate manner, as directed by
072168 - the Contracting Officer.
072169 -
072170 -
072171 - Changed section 3 "Requirements" at ref OF 3 line 72 by adding a
072172 - "General" heading under section "a", and making the lowercase letter
072173 - subsections in the original document, beginning at ref OF 2 line 70,
072174 - numerals, instead of letters, so there is a consistent outline
072175 - structure. Creaded a new section "b" for Communication Metrics using
072176 - the listing from the draft scope of services issued to Marc McGovern.
072177 - I added a another section c to provide support for Leonard in the
072178 - Sausalito office.
072179 -
072180 - We need to implement a consistent attachment method. There are
072181 - no attachents to the document received from Tom Keesling
072182 - yesterday, but several are mentioned in the document. I have
072183 - created some appendix, and call them letters. We need to
072184 - assemble all attachments and develop a consistent means of
072185 - identification.
072186 -
072187 -
072188 - Changed section 4 Period of Services at ref OF 3 line 246, and
072189 - explaining the period of services will run for the duration of the
072190 - dredging construction contract. The remainder of this section
072191 - discusses deliverables, or submissions, and so should be made a
072192 - separate section, possibly called responsibilities.
072193 -
072194 - Secton 5 is entitled "Responsibilities" but actually contains stuff
072195 - about where to submit billings and a long sped on personnel
072196 - qualifications, seems like it can be made into two new paragraphs on
072197 - Payment and Personnel.
072198 -
072199 - Think I want to change location of work and in that section explain
072200 - where various duties will be performed, and travel provisions.
072201 -
072202 -
072203 - Changed at ref OF 2 line 283:
072204 -
072205 - (2) Specific Qualifications - The A-E Construction
072206 -
072207 - Quality Assurance <0315
072208 - Quality Assurance Representatives must, at a minimum, have had
072209 - ---------------
072210 -
072211 - ...to, at ref OF 3 line 467:
072212 -
072213 - (b) Specific Qualifications - The A-E Construction
072214 -
072215 - Quality Assurance inspectors must, at a minimum, have had
072216 - ----------
072217 - This reflects that this section pertains only to inspector
072218 - qualifications and not to Communication Metrics.
072219 -
072220 -
072221 - Schedule of Services, added this as para 5 after "Duration of
072222 - Services," at ref OF 3 line 287.
072223 -
072224 - Tried to fix an apparent conflict in sequencing:
072225 -
072226 - The description of the work says the A-E will meet with the
072227 - Contacting Officer during the initial stating of Quality Assurance
072228 - procedures to ensure complete understanding of operating
072229 - conditions, reporting requirements, etc., ref OF 2 line 20.
072230 -
072231 - The original checkpoint 1 under "Period of Services" says that
072232 - within 5 days of award of the contract A-E shall assign personnel
072233 - and submit a comprehensive management plan, ref OF 2 line 158 and
072234 - at ref OF 2 line 169.
072235 -
072236 - Seems like we need the meeting with the Contracting Officer to
072237 - confirm the scope of work and conditions, in order to submit a
072238 - plan. So I moved the para on meeting with the Contracting Officer
072239 - from the Description to the Schedule of Services and made it
072240 - checkpoint 1, ref OF 3 line 289, then made the other stuff
072241 - checkpoint 2, 3, etc.
072242 -
072243 -
072244 - I tried to roll up the description of how reports are to be prepared,
072245 - as explained for "report packages" shown in the original at ref OF 2
072246 - line 208, and put it above the types of reports to be submitted.
072247 - This seems to present a conflict because the language lists a series
072248 - of elements identified as (a), (b) and so on, then below that there
072249 - are additional paragraphs also labeled (a) and (b).
072250 -
072251 - What is the distinction between these?
072252 -
072253 - I eliminated the paragraph that calls for prepareing reports on 8.5 x
072254 - 11 paper typwritten or handwritten, and also submitting reports on
072255 - Wordperfect or other software, ref OF 2 line 215, since this seems
072256 - conflicting. I prescribed instead, that A-E submit daily reports
072257 - using a transmittal form listing the items in the report, ref OF 3
072258 - line 343. I also say under Requirements para 3a(13) that A-E reports
072259 - shall submit to the extent practicable information in the form
072260 - requested by Communication Manager, ref OF 3 line 197.
072261 -
072262 - [See follow up at ref SDS 14 line 106.]
072263 -
072264 -
072265 - Checkpoint meetings each week between A-E Project Manager(s) and the
072266 - Contracting Officer, ref OF 3 line 147, is this the same as the weekly
072267 - Progress Meeting with the Contractor? If not, is A-E Project Manager
072268 - required to attend that meeting as well? Shall Communication Metrics
072269 - be provided for the A-E Inspector meeting with the Contracting
072270 - Officer? What is the practice on the Oakland Harbor project?
072271 -
072272 -
072273 -
072274 -
072275 -
072276 -
072277 -
072278 -
072279 -
072280 -
072281 -
072282 -
072283 -
072284 -
072285 -
072286 -
0723 -
0724 -
Distribution. . . . See "CONTACTS"