DIARY: October 12, 1994 08:26 AM Wednesday; Rod Welch

Called re status of Induction Study.

1...Summary/Objective
.....Report Strategy


..............
Click here to comment!

CONTACTS 
0201 - PG&E Trans Sys Engineering         415 973 3877 fax 9209
020101 - Ms. Maria P. Ly, E.E.; =415 973 0399
0202 - PG&E Trans Sys Engineering         415 973 3877 fax 9209
020201 - Mr. Gregory J. Chang
020202 - Programer Analyst; Rm 530B, Mail Code F5C =415 973 4314

SUBJECTS
PM PG&E Contract - Lori Brown
Pipeline coating integrity
Pipe insulation
CDWR submit information for induction study
PG&E submit induction study
Schedule meeting

1008 -    ..
1009 - Summary/Objective
1010 -
101001 - Followed up work at ref SDS 13 line 126, and conference call with
101002 - Bill, Lori and Kevin today at ref SDS 14 line 60.
101003 -
101004 - Pipe spec is inadequate, developed strategy for report.  Scheduled
101005 - meeting to review with PG&E staff and then with CDWR.
101006 -
101007 -
1011 -
1012 -
1013 - Progress
1014 -
101401 - Left message on Maria's voice mail of plan to meet next Monday,
101402 - October 17, so Bill DeHart and Kevin Coffee can get status of
101403 - induction study, prior to meeting with CDWR in Sacramento on Tuesday,
101404 - Oct 18, 2pm.
101405 -
101406 - Sent confirmation to Maria, Bill and Kevin via EM, ref DIT 1 line 30.
101407 -
101408 -
101409 -
101410 -
1015 -
1016 -
1017 - 1350 Maria called back
1018 -
101801 - She said the coating spec is inadequate.  It does not contain the
101802 - information needed to develop the information CDWR requested.
101803 -
101804 -
101805 -     Report Strategy
101806 -
101807 -     Her suggestion is to not treat this matter in PG&E's report.
101808 -     Instead, PG&E will advise CDWR of the voltage that will be induced
101809 -     onto the pipeline, and CDWR can determine any implications with
101810 -     respect to coating integrity, grounding mitigation, etc.
101811 -
101812 -
101813 - She cannot meet on 941018.  I advised Bill of this, and he spoke with
101814 - Maria.
101815 -
101816 - They decided to recommend to CDWR a meeting on 941103 with CDWR to
101817 - submit report.
101818 -
101819 - Bill wants to meet to review report on 941025.
101820 -
101821 -     Maria proposed meeting internally on 941102.
101822 -
101823 -
101824 - I recommended that given the history of preparing this report, the
101825 - PG&E internal meeting should not wait until the day before the report
101826 - is due to CDWR to review status.  Even if she is not available, we can
101827 - meet with Greg who is doing the report.  This should be a minimum of
101828 - a week in advance.
101829 -
101830 -
101831 -
101832 -
1019 -
1020 -
1021 - 1410 Bill called Maria back
1022 -
102201 - He advised he cannot meet on 941102, and proposed the week of 9410254.
102202 - Maria asked to meet on 941031, which is Monday.
102203 -
102204 -
102205 -
102206 -
1023 -
1024 -
1025 - 1415 Bill called Kevin
1026 -
102601 - Bill explained Maria's point about the pipe coating spec.  He advised
102602 - of Maria's proposed meeting schedule.
102603 -
102604 - Kevin wants to meet with Maria next week on status of report, rather
102605 - than wait to 941031.
102606 -
102607 -
102608 -
1027 -
1028 -
1029 - 1428 Bill called Maria back
1030 -
103001 - Maria will meet on either Thursday 941020 or 941021, Friday to review
103002 - status of study with PG&E.  She needs to confirm date with Greg who
103003 - is out today.
103004 -
103005 - She said the report will be complete on 941101.
103006 -
103007 -
103008 -
103009 -
1031 -
1032 -
1033 - 1430 Bill called Lori Brown
1034 -
103401 - Advised of proposal to meet 941103, and explained the scope of
103402 - Maria's proposed treatment of pipe coating matter.
103403 -
103404 -
103405 -
103406 -