S U M M A R Y
DIARY: August 30, 1994 10:38 AM Tuesday;
Rod Welch
Maria advised status Induction study for CDWR.
1...Summary/Objective
..............
Click here to comment!
CONTACTS
0201 - Pacific Gas & Electric Company 415 973 6778 fax 8426
020101 - Mr. Bill DeHart, PMP
020102 - Senior Project Manager, Room 1183B-V11C =415 973 5655; Transmissions Systems
0202 - PG&E Trans Sys Engineering 415 223 0399 fax or 800...
020201 - Ms. Maria P. Ly, E.E.; =415 973 0399
SUBJECTS
Transmission Line Engineering - Grounding Study (Maria Ly)
Project Manager, Bill DeHart
Steady State
Fault Condition
Contract, Controls, Scope, Induction, Mitigation
0807 - ..
0808 - Summary/Objective
0809 -
080901 - Followed up work at ref SDS 3 line 844, indicating PG&E will complete
080902 - study by Nov 1, 1994.
080903 -
080904 - Bill talked to Maria today. She said Mike Chan has been assigned full
080905 - time to perform this study.
080906 -
080907 - Maria said she has obtained the information needed from CDWR on
080908 - location of valve pits for the pipeline project, requested at ref SDS
080909 - 3 line 835, and at ref SDS 3 line 788, which is action item 16 at ref
080910 - SDS 3 line 128.
080911 -
080912 - PG&E will prepare a study that includes a table showing inducation as
080913 - a function of distances between power poles, so this can support the
080914 - design of the system.
080915 -
080916 - It is expected this will be complete by the end of September, consist-
080917 - ent with the understandings at ref SDS 3 line 150.
080918 -
080919 -
080920 - Scheduled follow up task to evaluate status on 940912.
080921 -
080922 -
080923 -