DIARY: May 4, 1993 04:00 PM Tuesday; Rod Welch

Meeting at KH re CM scope Mission Bay.

1...Summary/Objective
.......Comment
2...Lotus Out of Memory, LIM 4.0

ACTION ITEMS.................. Click here to comment!

1...I need to prepare a scope statement by end of May, to address the
2...Looks like we need one more lift with debug 100, to figure the

CONTACTS 
0201 - Kwan Henmi Arch & Planng           415 626 6766
020101 - Mr. Denis Henmi; Principal

SUBJECTS
Welch CM Services
Proposals, Mission Bay

0404 -    ..
0405 - Summary/Objective
0406 -
040601 - Discussed ideas at ref SDS 7 line 105.
040602 -
040603 - Received ref DRT 1, which is a document in process of being finalized.
040604 - Page 1 is table of contects, dated 920203.  Other pages have different
040605 - dates, indicated these are dates of last revision.
040606 -
040607 -    This document has scope of construction administration for which
040608 -    Denis wants a proposal to perform.  The construction contract is
040609 -    expected to be about $15M for phase 1.  Construction is scheduled
040610 -    for a July 1994 start with completion in 14 months.  There are
040611 -    numerous phas- es, stretching over a 20 year period of
040612 -    construction.
040613 -
040614 -    Generally, he expects there will be from 2 - 3 days work per week
040615 -    representing KH; so, that is the commitment required from Welch.
040616 -
040617 -    We expect about 2 weeks initial CM work becoming familar with the
040618 -    project documents used the contractor for construction.
040619 -
040620 -    The current document calls for the architect to provide construc-
040621 -    tion administration.  The developer is discussing with Bechtal,
040622 -    Turner, Perini, and possibly MK, providing CM services.  In that
040623 -    case Denis wants a CM to represent KH in its dealings with the
040624 -    Developers CM.
040625 -
040626 -    Denis feels the CM work under the present proposed Agreement does
040627 -    not require a resident CM.
040628 -
040629 -       Comment
040630 -
040631 -       This seems suprising for a $15M job constructed under code
040632 -       requirements of SF.
040633 -
040634 -
040635 -    Denis has a meeting schedule for 1st week in June, 1993 to finalize
040636 -    his agreement with developer, so KH can commence the working
040637 -    drawings in July.
040638 -
040639 -
040640 -    He plans to have the lead architect do a CPM for KH design
040641 -    activities.  The Developer has hired a GC to review bid documents
040642 -    for constructability and price.
040643 -
040644 -
040645 - I need to prepare a scope statement by end of May, to address the
040646 - specifics of this project.
040647 -
040648 -
040649 -
040650 -
0407 -

SUBJECTS
Kwan Henmi SDS Installation
Screen Delayed in Reports, under Windows

0505 - Summary/Objective
0506 -
050601 - Entered comments in Denis' records at ref SDS 9 line 060801, to
050602 - explain findings on this point per ref SDS 6 line 061216.
050603 -
050604 -
050605 -
0507 -

SUBJECTS
Kwan Henmi SDS Installation
Billing System

0605 - Summary/Objective
0606 -
060601 - Found that we were missing a selection command file, ref OF 1.
060602 -
060603 - After this was added we were able to proceed through the final Lotus
060604 - calculation macro, but we still got hung up at the end.
060605 -
060606 -     Looks like we need one more lift with debug 100, to figure the
060607 -     thing out.
060608 -
060609 -
060610 - Lotus Out of Memory, LIM 4.0
060611 -
060612 - Also encountered an out of memory message in Lotus, ref SDS 9 line
060613 - 070605.  Looks like Windows 3.1 is not applying LIM 4.0 for Lotus
060614 - 2.4, so with SeeMore loaded, we are running out of memory.  Seems to
060615 - me that Windows 3.1 should load LIM 4.0 automatically as os2 does.
060616 -
060617 -
060618 -
060619 -
0607 -

SUBJECTS
Kwan Henmi SDS Training
Review & Correct SDS records

0705 - Summary/Objective
0706 -
070601 - Downloaded Denis' records to reveiw and comment.  I also need to
070602 - provide some more detail on SDS training and support in his SI.
070603 -
070604 -
0707 -
Distribution. . . . See "CONTACTS"