DIARY: January 20, 1992 09:19 AM Monday; Rod Welch

Review Tudor 910816 letter on Speed Increaser options.

1...Summary/Objective
2...Tudor Supported Recommendation to Replace Speed Increaser
3...Meaning Drift Makes Communication Biggest Risk in Enterprise
4...Discovery of Tudor's 910816 letter presents entirely different meaning


..............
Click here to comment!

CONTACTS 

SUBJECTS
Document Log
Organize existing record, 911004
Complaint aganist Tudor

0605 -
0605 -    ..
0606 - Summary/Objective
0607 -
060701 - Follow up ref SDS 9 0000.
060702 -
060703 - Today I am scanning documents from DNRC manual files into the SDS
060704 - document log that are needed for project management and claims
060705 - support.
060706 -
060708 -  ..
060709 - Scanned DNRC's draft complaint, ref OF 1, which seems to have been
060710 - drafted during the month of December 1991.
060711 -
060712 -
060713 -
060714 -
0608 -

SUBJECTS
Engineering Management, 911011
CPM showing expected progress
and constraints
Mitigation (Voith Instructions)
Speed Increaser Replacement Analysis & Engineering
Case Study Broadwater
Plant Inspection Not Being Performed for Conformance with Proejct Req
Speed Increaser Replacement Recommended by Tudor Meaning Drift Offici

4110 -
411101 -  ..
411102 - Tudor Supported Recommendation to Replace Speed Increaser
411103 - Meaning Drift Makes Communication Biggest Risk in Enterprise
411104 -
411105 - Today, the complete letter from Tudor dated 910816, ref DRP 1 0000,
411106 - was discovered in the project records, that explains DNRC's options
411107 - for replacing or repairing the speed increaser.
411108 -
411109 - This turns out to be a comprehensive analysis, including very detailed
411110 - daily work plans and CPM schedules under alternate scenarios comparing
411111 - financial risks of replacing the speed increaser, v. repair.  Under
411112 - "repair" there are vairous matters that can significantly extend the
411113 - down-time period, where-as it seems to be contended in the report that
411114 - replacement of the speed increaser eliminates such risks.
411115 -
411117 -  ..
411118 - Discovery of Tudor's 910816 letter presents entirely different meaning
411119 - than was originally explained by Sarah in our telephone call on
411120 - 911105. ref SDS 2 2572  At that time, Sarah faxed only the 2 pages of
411121 - Tudor's letter, and did not include enclosures.  Discussion on 911105
411122 - indicated that Rick Bondy found that Tudor's enclosures were not
411123 - important. ref SDS 2 2572 The two pages Sarah faxed on 911105 do not
411124 - cite the detailed analysis that supports the summary report.
411125 - ref SDS 2 0735.
411127 -  ..
411128 - However, Tudor's recommendations and analysis in the letter on 910816
411129 - provide strong justification for the engineer to direct Voith to
411130 - replace the speed increaser in order to mitigate damage from Voith's
411131 - defective work.  This is quite different from understandings on
411132 - 911105.
411133 - ..
411134 - Similar misunderstandings on engineering review of the plant
411135 - reported 911009. ref SDS 1 3333
411136 -
411137 -       [On 920124 Rick Bondy's analysis did not include all of the
411138 -       information in Tudor's recommendation to replace the speed
411139 -       increaser. ref SDS 10 4476
411140 -
411141 -       [On 961010 similar problems occurred on USACE project for a
411142 -       claim on the Navy Sewer Line work. ref SDS 11 3885
411144 -      ..
411145 -     For one thing, it appears that Tudor has done a substantial amount
411146 -     of analysis on what needs to be done.  Given their prior work
411147 -     performance, it is not possible to judge the quality of this work,
411148 -     but it should be analysed for adequacy by the new Engineer Power,
411149 -     so we make sure all available information has been considered and
411150 -     we do not duplicate work.
411151 -         ..
411152 -         It appears parenthetically that Tudor did a tremendous
411153 -         amount of work to prepare this 50 page or so report,
411154 -         especially the work plans.
411156 -      ..
411157 -     If this analysis is supported by careful review, then DNRC should
411158 -     use the information to negotiate with Voith on which approach to
411159 -     take.  If Voith substantiates the risks cited by Tudor, then DNRC
411160 -     can direct Voith through the Engineer to replace the speed
411161 -     increaser as the least costly alternative.  If Voith holds that
411162 -     such risks do not exist, then DNRC can permit Voith to proceed
411163 -     with replacement under the condition that if the risks cited by
411164 -     Tudor materialize, then Voith will at a minimum indemnify DNRC for
411165 -     the cost of same.
411167 -        ..
411168 -       [.... later today prepared memo for Wayne on DNRC options to fix
411169 -       speed increaser problem, based on review with Walt and Sarah,
411170 -       ref SDS 9 7777