S U M M A R Y


DIARY: November 25, 1991 02:10 PM Monday; Rod Welch

Review schedule impacts on Broadwater re Tudor, Voice failure to perform.

1...Summary/Objective
2...Follow Up


..............
Click here to comment!

CONTACTS 
0201 - Dep Natrl Rscrs & Consvn           406 444 6699 fax 6721
020101 - Mr. Wayne Wetzel
020102 - Mr. Walt Anderson; Hydro Power Section Supervisor; Engineering Division

SUBJECTS
Voith Contract Closeout
CPM showing expected progress and constraints
Facilitator Improves Meetings Without
Communication Manager Examples of Work Product

0506 -    ..
0507 - Summary/Objective
0508 -
050801 - Following the meeting with the Director, I asked Wayne if he
050802 - would participate in the planning meeting, recommended previously at
050803 - ref SDS 2 line 96, and called for in the meeting with the Director
050804 - today, ref SDS 9 line 324.
050805 -
050806 - We used the conference room which has large writing boards.  I acted
050807 - as the facilitator using the SDS record to identify issues and provide
050808 - background for planning and decision support.
050809 -
050810 -
050811 -
0509 -
0510 -
0511 - Discussion
0512 -   ..
051201 - Wayne and Walt incorporated the Director's decision to fire
051202 - Tudor and hire a new Engineer, into the CPM schedule for completing
051203 - the Voith contract, per ref SDS 9 line 105.
051204 -
051205 -    Looks like the design problems and the time for manufacturing will
051206 -    now likely not permit DNRC to meet its objective of doing the speed
051207 -    increaser work on the plant during a period of low revenue.
051208 -
051209 -    Seems like replacing the speed increaser will mean 2 months
051210 -    downtime for the plant, and the repair alternative will cost 5
051211 -    months of downtime, according to this initial analysis.
051212 -
051213 -    The revenue curve shows there is now a strong chance that signifi-
051214 -    cant revenue losses will occur initially to the State and for which
051215 -    the State will be forced to seek to recover from Tudor and Voith.
051216 -
051217 - ..
051218 - Walt will draft up the CPM alternative scenerios to support
051219 - firing Tudor and hiring a new Engineer on an expedited basis.
051220 -
051221 -
051222 -  ..
051223 - Follow Up
051224 -
051225 - We need a good CPM program that can make us some time scaled networks
051226 - so the alternatives can be evaluated as the dynamics of hiring a new
051227 - Engineer and different options for handling the submittal process
051228 - unfold in the coming weeks.
051229 -
051230 -
051231 -
0513 -

SUBJECTS
Voith Contract Closeout
Legal outside counsel

0605 - Discussion
0606 -
060601 - Wayne and Walt expressed concern that DNRC's outside counsel Peter
060602 - Lamb's opinions may reflect in some measure his association with an
060603 - organization that relates to protecting American Standards, and
060604 - therefore interests of his clients, domestic manufacturers, relative
060605 - to a foreign manufacturers. like Voith and Renk.
060606 -
060607 - They indicated less concern on this point with respect to Geartech.
060608 -
060609 -
060610 -
060611 -
060612 -
060613 -
060614 -
060615 -
060616 -
0607 -
Distribution. . . . See "CONTACTS"