S U M M A R Y


DIARY: September 22, 1988 09:00 AM .......; Rod Welch

Worked at BPP on various matters.

1...Summary/Objective
2...Gracon Landing Not Effective Due to Sletten Failure to Cooperate
3...Gracon Access
4...Feasibility Downstream
5...Sletten Blocks Access Upstream Cofferdam
6...Walking Causing Severe Pain - Need Solution
7...Strike Delay
8...Sletten Needs Skilled Support from Voith to Meet Schedule


..............
Click here to comment!

CONTACTS 
0201 - O-0395 0201 Department of Natural      406 444 6699
020101 - Mr. Norman Barnard,
0202 - O-0394 0301 Voith Hydro, Inc.          717 792 3511   717 792 3862 FAX
020201 - Mr. Kenneth L. Carlson, Field Representative, =406 266 3275
0203 - O-0392 0302 Sletten Construction       406 761 7920   406 761 0923 FAX
020301 - Mr. Dave Marsh, Project Coordinator
0204 - O-0392 0201 Sletten Construction       406 761 7920   406 761 0923 FAX
020401 - Mr. Paul Robinson, Project Coordinator
0205 - O-0393 0201 Gracon Corporation         303 667 2203
020501 - Mr. Dale Harrington,
020502 - Broadwater Power Project

SUBJECTS
General Management

0403 -    ..
0404 - Summary/Objective
0405 -
040501 - Jeff asked about the 880919 Diary record. ref SDS 4 7458
040502 -
040503 - Initially, he had a document submitted to Paul Robinson, and asked if
040504 - it is part of the SDS diary record?
040505 -
040506 - I affimred that it is an extract from the SDS record, same as notes of
040507 - Progress meetings and all other documents I have prepared for Tudor
040508 - are extracts from the Diary.
040509 -
040510 - Jeff said that it was incorrect to have issued the document under my
040511 - own name, that rather he should sign such submittals.  He further
040512 - advised that Tudor does not distribute its Diary to others, nor to the
040513 - Contractor.
040514 -
040515 - He said that he retrieved the copy that was to be mailed to Sletten's
040516 - office in Great Falls for Bill Merriam.  He asked whether the copy
040517 - had been picked up by Sletten's field office.
040518 - ..
040519 - I advised that the document has been obtained by Sletten.
040520 -
040521 - Jeff asked me to retrieve it.  Since the Progress meeting was about to
040522 - begin, the Sletten people were arriving and so Jeff asked Paul
040523 - Robinson if he had received the document. Paul said yes and he had
040524 - prepared a response. Jeff asked him to return the document, and Paul
040525 - after inquiring to make sure he understood the request correctly,
040526 - agreed to return the document.
040527 -
040528 - Need to address use of SDS for Command and Control of the record to
040529 - clarify and explain objectives for Tudor management.  Tie into
040530 - assignment. Explain concepts.
040531 -
040532 -    [On 880925 submitted letter to Jeff, Tudor and DNRC. ref SDS 7 8493
040533 -
040534 -
040535 -
040536 -
0406 -
0407 - ëLTX5 Meeting Notes Scope Letter Procedures
0408 -
040801 - During the Progress meeting today, ref SDS 6 6038, Bill Merriman
040802 - inquired about the intent of the Notes for the prior meeting on
040803 - 880914. ref SDS 2 0026  The intent is expressly stated, in placing a
040804 - burden on Sletten to support its entitlement in accordance with
040805 - standard contract practice (the Claimant must prove its a prima facia
040806 - case).
040807 -
040808 - An additional purpose was to provide some relief for the Engineer in
040809 - reducing the volume of letters it has committed to furnish.
040810 -
040811 - In this case Jeff agreed to furnish the letter.
040812 -
040813 - Additionally, Bill Merriman's inquiry occurred in the absence of an
040814 - explanation which was created for the record to deal with this
040815 - occurrance, see ref 11 line 061211 to 061239.  These lines were
040816 - omitted in the Notes furnished to Sletten, ref 10.
040817 - ..
040818 - It is not contended the decision to omit was an error.  This
040819 - record does, however, illustrate the use of the Diary which is
040820 - intended to provide a data base for advocating the interests of the
040821 - State and Tudor.  Mr. Merriman's question would ordinarily have been
040822 - referred to the cite.  Since the citation was not available, some
040823 - scrambling was necessary.
040824 -
040825 -
0409 -
0410 -
0411 -

SUBJECTS
Outstanding Letters

050301 - Need list of letters from Paul Robinson.
050302 -
050303 - Paul didn't provide this today. (see also the Progress meeting).
050304 -
050305 -
050306 - Jeff asked me to concentrate on creating this list for the next
050307 - major project, rather than the change orders.
050308 -
050309 - He wants to see a list of documents Sletten has submitted for which
050310 - there are no responses from Tudor.  Asked to begin with August.
050311 -
050312 -
050313 - I put the documents back on Jeff's desk which had been removed by
050314 - Wayne Wetzel and Norm Barnard this morning in preparation of Progress
050315 - meeting with Sletten.  In doing so, I arranged them in what seemed to
050316 - be associated groups and noticed that these documents may constitute
050317 - the list Tudor is seeking.
050318 -
050319 -
0504 -
0505 -

SUBJECTS
Meeting Tape Recordings

0604 -
060401 - I advised Wayne Wetzel and Norm this morning before the meeting with
060402 - Tudor that DNRC should have someone with contract legal experience
060403 - listen to the tapes each week and advise us of any matters that might
060404 - require clarification in the subsequent meeting.
060405 -
060406 - Wayne will advise Sarah Bond of this recommendation.
060407 -
060408 -
060409 -
060410 -
0605 -
0606 -

SUBJECTS
Change Order Review

0704 -
070401 - Began looking at this today.
070402 -
070403 - Sletten submitted its list of Claims and Change orders it feels are
070404 - pending answers from the Engineer.
070405 -
070406 - Many of these are frivoulous.  The "Triangle Fabrication" claim for
070407 - extra time has been discussed as recently as Tuesday, and Sletten
070408 - agreed to furnish additional information.  This understanding was
070409 - among the matters in the Diary which Jeff asked to be retrieved.
070410 -
070411 - The $225,000 amount paid to Sletten for acceleration for "...the 30
070412 - day period..." is not very helpful.  Could be used to show a
070413 - stipulation as to monthly cost of acceleration.
070414 - ..
070415 - If Sletten wins the acceleration point, then damages could be
070416 - real big very fast.
070417 -
0705 -
0706 -
0707 -

SUBJECTS
Gracon Downstream Access
Barge Operation

0905 -
090501 -  ..
090502 - Gracon Landing Not Effective Due to Sletten Failure to Cooperate
090503 -
090504 - While driving back from the Post Office about 1300  Rod Welch noticed
090505 - Gracon attempting to dock its barge on the bank landing.  They
090506 - appeared to be having trouble.  Got Jeff and we went over to take a
090507 - closer look.
090508 -
090509 - Dale was just coming up the bank and we asked how he was doing.  Dale
090510 - advised that they experienced more difficulty than expected based on
090511 - prior attempts to dock, due to the greater current resulting from the
090512 - operation uderway to lower the reservoir by 2 feet.  Dale explained
090513 - they did not have this kind of trouble on the prior occassions.
090514 -
090515 - Rod suggested Gracon consider running another line to the landing so
090516 - they have a positive control for the landing operation.  Dale said
090517 - they need another deck winch for this.  He also expressed concern
090518 - about the line interfering with fishermen who might frequent the area.
090519 - Rod suggested the line could be slacked off when it is not in use so
090520 - it would lie on the river bottom.  Upon discussion  this may not be
090521 - practical.
090522 -
090523 -
090524 -  ..
090525 -
090526 -  ..
090527 - Gracon Access
090528 - Feasibility Downstream
090529 -
090530 - Looking at the area with Dale and Jeff, there does not appear to be a
090531 - viable alternative to using the existing landing.  The water is too
090532 - shallow downstream to land the barge.
090533 -
090534 -
090535 -
0906 -
0907 -

SUBJECTS
Coordination with Gracon
Upstream Cofferdam Access

1105 -
110501 -  ..
110502 - Sletten Blocks Access Upstream Cofferdam
110503 -
110504 - Sletten's crane had not been removed from Cofferdam access by 1600 in
110505 - the afternoon.
110506 -
110507 -
110508 - Jeff prepared a supplemental letter to his directive from yesterday,
110509 - which was requested by Sletten at the Progress meeting this morning.
110510 - He consulted with Bill Merriman following the meeting  and presented
110511 - the letter afterwards.
110512 -
110513 -
110514 -
110515 -
1106 -

SUBJECTS
Operation 881110

1204 -
120401 -  ..
120402 - Walking Causing Severe Pain - Need Solution
120403 -
120404 - Looks like may need an operation or treatment of some kind on the
120405 - knee.  Had hoped the problem would clear up by not playing tennis, but
120406 - that is not happening.  I can barely get around now, and the work here
120407 - requires being mobile, per above. ref SDS 0 2066
120408 -
120409 - When I was out on the Dam to review Gracon's operation to install the
120410 - rubberized equipment, I thought I would not be able to get back to the
120411 - trailer, because just lifting the knee is very painful now.  Putting
120412 - weight on it is worse.  I had to walk a few steps, then rest -- took
120413 - 30 minutes to the end of the dam, down the ladder, across the
120414 - cofferdam and back to the trailer.
120415 -
120416 -     [On 880924 Millie will find a doctor. ref SDS 8 0001]
120417 -
120418 -     [On 880928 reported symptoms to Jim Glick. ref SDS 9 0001]
120419 -
120420 -
120421 -
120422 -
1205 -
1206 -

SUBJECTS
Discussed Scheduling
& Management of Voith Contract
Interface with Sletten

1406 - 1150 Dave Marsh Visited
1407 -
140701 -  ..
140702 - Strike Delay
140703 -
140704 - Primary purpose of Dave's visit was to advise that a Union Business
140705 - Agent or representative was on site and had given indications that
140706 - the job will be struck tomorrow.  Dave said that Sletten is preparing
140707 - now to post signs to designate alternate access routes.  He request-
140708 - ed that the Engineer have Gracon do the same so the Sletten people
140709 - can enter the job without being affected by picketing aimed at
140710 - Gracon.
140711 -
140712 - Jeff said that Gracon has constructed entry signs and is ready to
140713 - post them.  He will advise them to do so.
140714 -
140715 - Dave also advised that he believes Gracon people may be using
140716 - Sletten's access and that this could undermine the idea of having
140717 - alternate entry's.  Jeff will inform Gracon to direct its work force
140718 - to use the Gracon gate.
140719 -
140720 -
140721 -
140722 -
1408 -
1409 -

SUBJECTS
Scheduling
Voith Start Date

1605 -
160501 -  ..
160502 - Sletten Needs Skilled Support from Voith to Meet Schedule
160503 -
160504 - I asked Dave how confident he is of Sletten being able to meet the
160505 - 881017 completion objective.  Ken Carlson was present during the
160506 - meeting.
160507 -
160508 - I explained it appears that Curb Ring installation is already 1 week
160509 - behind Sletten's schedule.  Dave acknowledged this.
160510 -
160511 - Dave indicated there is still a "good possibility" this can be done.
160512 - He repeated Sletten's position that delay will be due solely to the
160513 - greater tolerances.  He said Sletten will put the Curb Ring to the
160514 - tolerances it holds are contract requirements, then request a change
160515 - order to achieve the 880803 Determination tolerances.  The time needed
160516 - to meet those tolerances will control when Voith can commence its
160517 - contract work.
160518 - ..
160519 - I asked how then Sletten could expect to complete by 881017  if
160520 - the cadwelding will require 8 more work days?
160521 -
160522 - Dave said this could be done on an accelerated basis.  He added, he is
160523 - unsure how it will actually turn out.
160524 -
160525 - I asked if Sletten could be aided in meeting its projected completion
160526 - dates, if a Voith mechanic, who has more experience in that kind of
160527 - work, performed the Curb ring operation?
160528 -
160529 - Dave advised that some of the 10 day activity duration is for forming
160530 - and reinforcing steel placement.
160531 -
160532 - I asked how much of the 10 days is for that?
160533 - ..
160534 - Dave didn't know.
160535 -
160536 -
160537 -
1606 -
1607 -
1608 - 1400 Ken came by for an extended visit with Jeff.
1609 -
160901 - Ken said he believes that if Sletten is claiming it can complete the
160902 - Curb Ring activity in 10 days, it will likely take 15 days based on
160903 - their record of performance.  He is doubtful that Sletten will
160904 - perform as promised in the meeting this morning.
160905 -
160906 - Jeff confirmed that Voith should schedule to start its Contract work
160907 - on 881017, based on representations from Sletten that it will be
160908 - ready on that date.  Jeff feels that the 3 weeks between now and
160909 - 881017 is adequate to perform the work needed for Voith to begin its
160910 - contract.
160911 - ..
160912 - Jeff and Ken discussed Voith's staging areas, particularly the
160913 - viability of storing supplies and equipment inside the structure.
160914 -
160915 -
1610 -

SUBJECTS
Schedule
Time Extensions
Updated Schedule

1806 -
1807 -   ..
180701 - Need to respond to Sletten's 880908 Schedule.  We havn't done
180702 - this yet.
180703 -
180704 - Sletten failed to pour the concrete activity #27 scheduled for today
180705 - and is not expected to be poured tomorrow.  This appears to make it
180706 - very difficult for them to meet the projected Voith start date 881017.
180707 - They are already 1 week behind.
180708 -
180709 -
1808 -
1809 -

SUBJECTS
Submittals
Rip Rap Silt Barrier

2005 -
200501 - Norm called from Helena following the meeting with Sletten on water
200502 - turbidity.
200503 -
200504 - He advised that Sletten did meet with the Agency about the Silt
200505 - Barrier requirements.  Apparently a glitch came up on the approval. I
200506 - got the impression that it might yet be worked out today.
200507 -
200508 -
2006 -

SUBJECTS
Payment Backfill Concrete
Notice to Contractor
to Submit Claim

2206 -
220601 - Paul and Jeff are supposed to meet for joint survey, Paul didn't stop
220602 - by probably because of the meetings in the morning and then in Helena
220603 - in the afternoon.
220604 -
220605 -
220606 -
220607 -
2207 -
2208 -
Distribution. . . . See "CONTACTS"