Moscone Center Expansion, Phase III
Gensler/Michael Willis/Kwan Henmi

03 96060 00 AC CK CK 0101

Document Log
Received Pending Response

Period: August 12, 1998 - November 11, 1998
Prepared: November 11, 1998

Issued Pending Response
All Activity

 
Document  Recvd         Respond  By
Date   #  Date  From   Date  Orgnztn  <-------- Description --------->


980917 01 980929 GWK-G CC 981020 GWK-K IR 50% CD Package, Recovery Strategy 980919 01 981010 GWK-G CC 981025 GWK-K IR Hang Points, Ceiling 2, 3 floor 980922 01 980929 GWK-G CC 981021 GWK-K IR 50% CD Package, To do items 980924 01 980929 GWK-G CC 981021 GWK-K IR Backgrounds Basement 980925 01 981001 GWK-W SH 981027 GWK-K IR Structural meeting, 980925, Steven 980929 01 980930 GWK-G CC 981015 GWK-K IR Gensler notes meeting on 980929 981002 01 981006 GWK-G CC 981027 GWK-K IR Struct. Coor, mtg 981001, Clonia 981003 01 981006 GWK-W SH 981027 GWK-K IR Struct. Coor, mtg 981001, Steven 981005 01 981013 GWK-G CC 981028 GWK-K IR To Do, Interior Elev, Clonia 981005 02 981013 GWK-G CC 981028 GWK-K IR To Do, Stair 13, Clonia 981005 03 981013 GWK-G CC 981028 GWK-K IR To Do, FHC, roof stair, FD, Clonia 981005 04 981013 GWK-G CC 981028 GWK-K IR To Do, Fire Exitg, Seprtn, Clonia 981006 01 981013 GWK-G CC 981028 GWK-K IR JV Coordination, 981006, Clonia 981006 02 981013 GWK-G CC 981028 GWK-K IR To Do, Moveable Walls, Clonia 981007 01 981013 GWK-G CC 981028 GWK-K IR To Do, Reflctd Ceilg, Clonia 981007 02 981013 GWK-G CC 981028 GWK-K IR To Do, Pre Func Ref Ceilg, Clonia 981007 03 981013 GWK-G CC 981028 GWK-K IR Mechanical meeting, 981007, Clonia 981008 01 981013 GWK-G CC 981028 GWK-K IR To Do, Pre Func Escltr,... Clonia 981008 02 981013 GWK-G CC 981028 GWK-K IR Structural meeting, 981008, Clonia 981019 01 981022 GWK-G CC 981106 GWK-K IR Life Safety meeting, 981019 981023 01 981023 GENSL JR 981109 GWK-K BP Internet Disconnected, 981023