DEPARTMENT OF THE ARMY
You are to proceed with this work in the manner specified while this RFP is being negotiated.
Sincerely,
Thomas Benero
Contracting Officer
Enclosures
References:
b. Sheet 7 of 20 of the contract drawings
The material, as it is excavated, will be determined to be of the concentrated debris going to the flat barge or suitable to be disposed of at the Galbraith disposal site. If a grid is used on the barge or scow, the material that remains on the grid is required to be handled as specified in the contract. Any debris collected on the grid is the responsibility of the contractor to remove from the project as required by reference (a).
The contractor shall provide sufficient number of flat barges and other equipment so as not to impact the dredging production in these areas of the contract work.
The contractor shall submit his detailed proposal and methodology for accomplishing this work as follows:
Bid Item Description Quantity/Unit Unit Price Amount new Removal of excess 1000 cyd $_______/cyd $________ debris from Todd and Schnitzer Wings.